EcoService Models Library (ESML)
loading
Variables Details
: (EM-549)
Back
Collapse All
Expand All
- Export Data to Spreadsheet (Free Viewers)
- View Variable Relationship Diagram (PDF)(1 pp, 80 KB, About PDF)
EM Identity and Description
EM-549 | |
Document Author
variable.detail.emDocumentAuthorHelp
?
|
Saleh, A. and O. Gallego |
Document Year
variable.detail.emDocumentYearHelp
?
|
2018 |
Variable General Info
Crop type ?Comment:To add a crop to the rotation, click Add Crop to Rotation. The user is then asked to select a crop from the pick list, a tillage type (No-till, reduced till, or intensive till), and rotation year. The crop list is customized according to the region in which the project is located. The rotation year indicates the sequence of the crop within the crop schedule, it does not represent the calendar year. Once the user has selected a crop type, tillage type and rotation year, clicking Upload will add the crop to the crop schedule. Once a crop is added to the crop schedule you will note that it includes several default management characteristics including a planting date, fertilizer applications, tillage schedule, and harvest. These operations can be modified or deleted as needed and new operations can be added. |
|
Variable ID
variable.detail.varIdHelp
?
|
13307 |
Not reported | |
Qualitative-Quantitative
variable.detail.continuousCategoricalHelp
?
|
Qualitative (Class, Rating or Ranking) |
Cardinal-Ordinal
variable.detail.cardinalOrdinalHelp
?
|
Non-Ordinal |
Not applicable |
Variable Typology
Crop type ?Comment:To add a crop to the rotation, click Add Crop to Rotation. The user is then asked to select a crop from the pick list, a tillage type (No-till, reduced till, or intensive till), and rotation year. The crop list is customized according to the region in which the project is located. The rotation year indicates the sequence of the crop within the crop schedule, it does not represent the calendar year. Once the user has selected a crop type, tillage type and rotation year, clicking Upload will add the crop to the crop schedule. Once a crop is added to the crop schedule you will note that it includes several default management characteristics including a planting date, fertilizer applications, tillage schedule, and harvest. These operations can be modified or deleted as needed and new operations can be added. |
|
Predictor-Intermediate-Response
variable.detail.displayVariableTypeHelp
?
|
Predictor |
Predictor Variable Type
variable.detail.displayPredictorVariableTypeHelp
?
|
Time- or Space-varying Variable |
Response Variable Type
variable.detail.resClassHelp
?
|
Not applicable |
Data Source/Type
variable.detail.dataTypeHelp
?
|
Not applicable |
Variable Classification Hierarchy
variable.detail.vchLevel1Help
?
|
2. Land Surface (or Water Body) Cover, Use, Substrate, or Metric |
--Land use/land cover type or dominant habitat type |
|
----Agroecosystems |
|
------Other, multiple, unspecified or unclear |
Variable Spatial Characteristics
Crop type ?Comment:To add a crop to the rotation, click Add Crop to Rotation. The user is then asked to select a crop from the pick list, a tillage type (No-till, reduced till, or intensive till), and rotation year. The crop list is customized according to the region in which the project is located. The rotation year indicates the sequence of the crop within the crop schedule, it does not represent the calendar year. Once the user has selected a crop type, tillage type and rotation year, clicking Upload will add the crop to the crop schedule. Once a crop is added to the crop schedule you will note that it includes several default management characteristics including a planting date, fertilizer applications, tillage schedule, and harvest. These operations can be modified or deleted as needed and new operations can be added. |
|
Spatial Extent Area
variable.detail.spExtentHelp
?
|
Not applicable |
Spatially Distributed?
variable.detail.spDistributedHelp
?
|
No |
Observations Spatially Patterned?
variable.detail.regularSpGrainHelp
?
|
Not applicable |
Spatial Grain Type
variable.detail.spGrainTypeHelp
?
|
Not applicable |
Spatial Grain Size
variable.detail.spGrainSizeHelp
?
|
Not applicable |
Spatial Density
variable.detail.spDensityHelp
?
|
Not applicable |
EnviroAtlas URL
variable.detail.enviroAtlasURLHelp
?
|
GAP Ecological Systems |
Variable Temporal Characteristics
Crop type ?Comment:To add a crop to the rotation, click Add Crop to Rotation. The user is then asked to select a crop from the pick list, a tillage type (No-till, reduced till, or intensive till), and rotation year. The crop list is customized according to the region in which the project is located. The rotation year indicates the sequence of the crop within the crop schedule, it does not represent the calendar year. Once the user has selected a crop type, tillage type and rotation year, clicking Upload will add the crop to the crop schedule. Once a crop is added to the crop schedule you will note that it includes several default management characteristics including a planting date, fertilizer applications, tillage schedule, and harvest. These operations can be modified or deleted as needed and new operations can be added. |
|
Temporal Extent
variable.detail.tempExtentHelp
?
|
Not applicable |
Temporally Distributed?
variable.detail.tempDistributedHelp
?
|
Yes |
Regular Temporal Grain?
variable.detail.regularTempGrainHelp
?
|
No |
Temporal Grain Size Value
variable.detail.tempGrainSizeValHelp
?
|
Not applicable |
Temporal Grain Size Units
variable.detail.tempGrainSizeUnitHelp
?
|
Not applicable |
Temporal Density
variable.detail.tempDensityHelp
?
|
user defined |
Variable Values
Crop type ?Comment:To add a crop to the rotation, click Add Crop to Rotation. The user is then asked to select a crop from the pick list, a tillage type (No-till, reduced till, or intensive till), and rotation year. The crop list is customized according to the region in which the project is located. The rotation year indicates the sequence of the crop within the crop schedule, it does not represent the calendar year. Once the user has selected a crop type, tillage type and rotation year, clicking Upload will add the crop to the crop schedule. Once a crop is added to the crop schedule you will note that it includes several default management characteristics including a planting date, fertilizer applications, tillage schedule, and harvest. These operations can be modified or deleted as needed and new operations can be added. |
|
Not applicable | |
Min Value
variable.detail.minEstHelp
?
|
Not applicable |
Max Value
variable.detail.estHelp
?
|
Not applicable |
Other Value Type
variable.detail.natureOtherEstHelp
?
|
Not applicable |
Other Value
variable.detail.otherEstHelp
?
|
Not applicable |
Variable Variability and Sensitivity
Crop type ?Comment:To add a crop to the rotation, click Add Crop to Rotation. The user is then asked to select a crop from the pick list, a tillage type (No-till, reduced till, or intensive till), and rotation year. The crop list is customized according to the region in which the project is located. The rotation year indicates the sequence of the crop within the crop schedule, it does not represent the calendar year. Once the user has selected a crop type, tillage type and rotation year, clicking Upload will add the crop to the crop schedule. Once a crop is added to the crop schedule you will note that it includes several default management characteristics including a planting date, fertilizer applications, tillage schedule, and harvest. These operations can be modified or deleted as needed and new operations can be added. |
|
Variability Expression Given?
variable.detail.variabilityExpHelp
?
|
Not applicable |
Variability Metric
variable.detail.variabilityMetricHelp
?
|
None |
Variability Value
variable.detail.variabilityValueHelp
?
|
None |
Variability Units
|
None |
Resampling Used?
variable.detail.bootstrappingHelp
?
|
Not applicable |
Variability Expression Used in Modeling?
variable.detail.variabilityUsedHelp
?
|
Not applicable |
Variable Operational Validation (Response Variables only)
Variable ID
variable.detail.varIdHelp
?
|
Validated?
variable.detail.resValidatedHelp
?
|
Validation Approach (within, between, etc.)
variable.detail.validationApproachHelp
?
|
Validation Quality (Qual/Quant)
variable.detail.validationQualityHelp
?
|
Validation Method (Stat/Deviance)
variable.detail.validationMethodHelp
?
|
Validation Metric
variable.detail.validationMetricHelp
?
|
Validation Value
variable.detail.validationValHelp
?
|
Validation Units
|
Use of Measured Response Data
variable.detail.measuredResponseDataHelp
?
|